Rod Adams explains why the lack of recent construction experience in the U.S. and the massive size of the Gen III nuclear power plant design, contributed to the excess costs and delays in building these types nuclear power plants. In contrast, Gen IV designs will be smaller with pre-fabricated components and allow for more rapid builds and learning through repetition.